| Project
Name |
Theoretical
Parameters |
Notes |
| Maximum Theoretical Torque of Drill Head (N·m) |
125000 |
|
| Maximum Theoretical Push-Pull Force of Drill Head (kN) |
3700
(10 motors) |
|
| Maximum System Set Working Pressure (MPa) |
35 |
Maximum
allowable instantaneous operating pressure: 42 MPa |
| Maximum Hydraulic System Flow (L/min) |
1320 |
|
| Drill Pipe Diameter (inches) |
5
or 5-1/2 |
Standard
oil drill pipe |
| Maximum Drill Pipe Length (m) |
9.6 |
|
| Maximum Drill Head Speed (rpm) |
95 |
|
| Maximum Push-Pull Speed (m/min) |
45 |
|
| Spindle Floating Distance (mm) |
100 |
|
| Mud Channel Diameter (inches) |
3 |
|
| Maximum Mud Throughput (L/min) |
2000 |
|
| Maximum Mud Pressure (MPa) |
12 |
|
| Incident Angle (°) |
8月18日 |
|
| Maximum Clamping Force of Pipe Clamp (KN) |
2540 |
|
| Maximum Breakout Force of Pipe Clamp (N·m) |
367000 |
|
| Drilling Unit Dimensions (Length × Width × Height) (mm) |
18610×3400×3600 |
Shipping
status |
| Drilling Unit Mass (kg) |
56000 |
|
| Maximum Track Speed (m/h) |
2500 |
|
| Permitted Operating Temperature (°C) |
-30~50 |
|
| Permitted Operating Humidity (%) |
>90 |
|
| Permitted Operating Elevation (m) |
Altitude
0-3000 |
|
| Reference Back-Enlarged Hole Diameter (mm) |
φ2000 |
According
to geological conditions |
| Reference Drilling Distance (m) |
2500 |
According
to geological conditions |