Leave Your Message
Goodeng Machine GMD80s Down-the-Hole Surface Drilling Rig Russian Susuman Gold Project
Surface Drilling Machine

Goodeng Machine GMD80s Down-the-Hole Surface Drilling Rig Russian Susuman Gold Project

2026-04-16

Project details:

1. Geological conditions: gravel + sandstone + frozen soil  .

2.Construction: Two shifts, 24-hour work system. Single shift 12 hours.
Fastest drilling reached 126 holes (756 meters), approximately 1500 meters per day.
Average daily efficiency: approximately 1000-1200 meters.

3. Temperature: From October to May, the temperature is consistently between -50°C and -10°C.
This construction operation was conducted in the temperature range of -35°C to -10°C.

4. Equipment maintenance: Daily maintenance once per shift. Initial maintenance every 250 hours, subsequent maintenance every 500 hours, and so on.

1c2f81925d626149585bf5443952972e
8476ab3288cc3fb82551845efc7a2bac

3382ad8c0291cf3c841d54891aea656b

CONTACT:
Evangelin

Whatsapp:+86 13601615181
Mobile: +86 18352028025
Email: linlaixian@goodeng.com.cn