Leave Your Message
Warm Congratulations to Goodeng Machine GS6000-LS Assists Shanxi Zhongxinyi in the Success of Luanhe River Natural Gas Pipeline Reconstruction Project!
Projects

Warm Congratulations to Goodeng Machine GS6000-LS Assists Shanxi Zhongxinyi in the Success of Luanhe River Natural Gas Pipeline Reconstruction Project!

2025-10-10

On September 24, 2025, Shanxi Zhongxinyi Construction Engineering Co., Ltd. successfully completed the Luanhe River Natural Gas Pipeline Crossing and Reconstruction Project. The project used a Goodeng Machine GS6000-LS horizontal directional drilling rig, laying a total length of 529 meters of pipeline with a diameter of 323 mm. The project's geological conditions consisted of pebble and gneiss formations.

6000工程图

01 Project Information

Project Name: Qianxi Luanhe River Channel Comprehensive Governance Project - Xindian Section Crossing Luanhe River Natural Gas Pipeline Reconstruction Project​

Construction Company: Shanxi Zhongxinyi Pipeline Construction Co., Ltd.​

Project Type: Natural Gas Pipeline Crossing Project​

Drill Rig Model: Goodeng Machine GS6000-LS HDD (Horizontal Directional Drilling) Machine​

Pipeline Specification: Φ323mm (Pipeline Diameter) × 520m (Crossing Length)​

Construction Achievement: Completed 8-to-1 pipe dragging completed in all-pebble formation,one-time successful pipe pulling​


6000工作图

02 Machine Advantage

The Goodeng Machine GS6000-LS large horizontal directional drilling machine integrates four core advantages, breaking through the bottleneck of complex stratum construction and becoming the core equipment of the project:​

1.Super Strong Stratum Adaptability: With maximum torque of 160000 N・m and high wear-resistant drill tools, it easily handles moderately weathered gneiss  and solves the problem of drill tool wear in all-pebble formation;​

2.Anti-interference Precision Steering: Equipped with anti-mineral interference steering system, it maintains drilling precision in stratum with large amount of minerals, ensuring "zero error" docking of pipe pulling;​

3.Efficient Sectional Pullback: The stepless speed regulation pullback system adjusts pullback force in real time according to pipe weight and soil friction, realizing stable construction of 8-to-1 sectional pipe dragging and avoiding pipe joint damage;​

4.Stable Long-time Operation: High-reliability power system supports  hours of continuous construction without failure, matching the project's 24-hour shift construction demand and ensuring the progress is on schedule.​6000机器图

If you are interested, please contact me:​

WhatsApp:+86 183 5202 8098
Kass Guo​