Warm Congratulations to Goodeng Machine GS6000-LS Assists Shanxi Zhongxinyi in the Success of Luanhe River Natural Gas Pipeline Reconstruction Project!
On September 24, 2025, Shanxi Zhongxinyi Construction Engineering Co., Ltd. successfully completed the Luanhe River Natural Gas Pipeline Crossing and Reconstruction Project. The project used a Goodeng Machine GS6000-LS horizontal directional drilling rig, laying a total length of 529 meters of pipeline with a diameter of 323 mm. The project's geological conditions consisted of pebble and gneiss formations.
01 Project Information
Project Name: Qianxi Luanhe River Channel Comprehensive Governance Project - Xindian Section Crossing Luanhe River Natural Gas Pipeline Reconstruction Project
Construction Company: Shanxi Zhongxinyi Pipeline Construction Co., Ltd.
Project Type: Natural Gas Pipeline Crossing Project
Drill Rig Model: Goodeng Machine GS6000-LS HDD (Horizontal Directional Drilling) Machine
Pipeline Specification: Φ323mm (Pipeline Diameter) × 520m (Crossing Length)
Construction Achievement: Completed 8-to-1 pipe dragging completed in all-pebble formation,one-time successful pipe pulling
02 Machine Advantage
The Goodeng Machine GS6000-LS large horizontal directional drilling machine integrates four core advantages, breaking through the bottleneck of complex stratum construction and becoming the core equipment of the project:
1.Super Strong Stratum Adaptability: With maximum torque of 160000 N・m and high wear-resistant drill tools, it easily handles moderately weathered gneiss and solves the problem of drill tool wear in all-pebble formation;
2.Anti-interference Precision Steering: Equipped with anti-mineral interference steering system, it maintains drilling precision in stratum with large amount of minerals, ensuring "zero error" docking of pipe pulling;
3.Efficient Sectional Pullback: The stepless speed regulation pullback system adjusts pullback force in real time according to pipe weight and soil friction, realizing stable construction of 8-to-1 sectional pipe dragging and avoiding pipe joint damage;
4.Stable Long-time Operation: High-reliability power system supports hours of continuous construction without failure, matching the project's 24-hour shift construction demand and ensuring the progress is on schedule.