Leave Your Message
Large-Scale Hdd Projects Reports

Large-Scale Hdd Projects Reports

2024-06-28

Summary of large-scale HDD projects reports in October——Outstanding achievements of Goodeng’s customers, who have finished fifteen pipelines successfully.

The customers of Goodeng Machinery have also reaped a fruitful harvest in October, which is a harvest month in China.They have completed their projects smoothly with the escort of large series HDD Rigs and after-sales service engineers. Such as China-Russia Gas Pipeline, Beijing LNG Gas Pipeline Tiangjing Emergency Reserve Project, Shandong Pipe Network South trunk Pipeline and other national key projects. The excellent performance of Goodeng large HDD Rigs in projects has also been well received by customers.

According to incomplete statistics, in October "Goodeng Machinery" customers completed a total of 15 large HDD projects, the project profile is as follows.

01

Product development3kn

Project Name:China-Russia East Line Jiaodu Port Directional Drilling Project. Construction Equipment:GS5000-L

Geological Conditions:Powdery sand layer

Pullback Pipe Diameter&Project Length:Φ1219mm×833m Start & Finish Times of Project:2021.8.20-10.2

02

Large-Scale Hdd Projects Reports (4)f37
Large-Scale Hdd Projects Reports (1)2tf
Large-Scale Hdd Projects Reports (2)may
Large-Scale Hdd Projects Reports (3)2m1

Project Name:Shandong Pipe Network South Trunk Line LNG pipeline F Zone Project

Construction Equipment:GS6000-L, GN2500 Mud pump Geological Conditions:Powdered clay

Pullback Pipe Diameter&Project Length:Φ1016mm×800m Start & Finish Times of Project:2021.8.27-10.2

03

Large-Scale Hdd Projects Reports (5)95i
Large-Scale Hdd Projects Reports (6)fhw
Large-Scale Hdd Projects Reports (8)hn3
Large-Scale Hdd Projects Reports (7)o08

Project Name:Jiangsu Coastal Transmission Pipeline Rudong-Changshu Project Construction Equipment:GS6000-T

Geological Conditions:Powdered clay

Pullback Pipe Diameter&Project Length:Φ1219mm×600m Start & Finish Times of Project:2021.9.22-10.4

04

Large-Scale Hdd Projects Reports (23)q9v
Large-Scale Hdd Projects Reports (24)fgn
Large-Scale Hdd Projects Reports (25)v7e
Large-Scale Hdd Projects Reports (22)4ks

Project Name:China-Russia East Line ( Yongqing-Shanghai ) Fifth Zone Project Construction Equipment:GS8000-L

Geological Conditions:Powdered clay

Pullback Pipe Diameter&Project Length:Φ1219mm×1230m Start & Finish Times of Project:2021.9.10-10.8

05

Large-Scale Hdd Projects Reports (21)4v1
Large-Scale Hdd Projects Reports (20)gi9
Large-Scale Hdd Projects Reports (29)(1)ybe
Large-Scale Hdd Projects Reports (26)gsf

Project Name:Shandong Pipe Network South Trunk line Gucheng River Project Construction Equipment:GS10000C-L

Geological Conditions:Clay and Rock

Pullback Pipe Diameter&Project Length:Φ1219mm×904m Start & Finish Times of Project:2021.7.20-10.13

06

Large-Scale Hdd Projects Reports (31)qsr
Large-Scale Hdd Projects Reports (32)f6c
Large-Scale Hdd Projects Reports (33)2wb
Large-Scale Hdd Projects Reports (30)7g4

Project Name:Shandong Pipe Network South Trunk Line Forth Zone Project Construction Equipment:GS6000-T

Geological Conditions:Powdered clay

Pullback Pipe Diameter&Project Length:Φ1219mm×657m Start & Finish Times of Project:2021.9.20-10.19

07

Large-Scale Hdd Projects Reports (34)fhi
Large-Scale Hdd Projects Reports (35)axb
Large-Scale Hdd Projects Reports (36)m2v
Large-Scale Hdd Projects Reports (37)gwg

Project Name:Shandong Pipe Network South Trunk Line Xiaoni River Project Construction Equipment:GS5000-L

Geological Conditions:Powdered clay

Pullback Pipe Diameter&Project Length:Φ1219mm×672.63m Start & Finish Times of Project:2021.9.8-10.25

08

Large-Scale Hdd Projects Reports (38)trx
Large-Scale Hdd Projects Reports (39)ovp
Large-Scale Hdd Projects Reports (40)sha
Large-Scale Hdd Projects Reports (41)6sy

Project Name:Shangxi Shenmu-Anping Gas pipeline Project Construction Equipment:GS12000C-L

Geological Conditions:Powdered clay

Pullback Pipe Diameter&Project Length:Φ813mm×1670m Start & Finish Times of Project:2021.9.9-10.29

09

Large-Scale Hdd Projects Reports (42)np4
Large-Scale Hdd Projects Reports (43)3ru
Large-Scale Hdd Projects Reports (44)561
Large-Scale Hdd Projects Reports (45)awh

Project Name:China-Russia East Line LNG Gas Pipeline Dinggang River Project Construction Equipment:GS10000C-L

Geological Conditions:Powdered clay

Pullback Pipe Diameter&Project Length:Φ1219mm×903m Start & Finish Times of Project:2021.10.5-10.29

10

Project Name:SINOPEC Construction Shandong Pipe Network Mu River Project Construction Equipment:GS6000-L

Geological Conditions:Rocky

Pullback Pipe Diameter&Project Length:Φ1016mm×1070m Start & Finish Times of Project:2021.5.1-10.18

11

Project Name:Beijing LNG Gas Pipeline Tiangjing Emergency Reserve Project Construction Equipment:GS6000-L

Geological Conditions:Entry point exit point sandy are sandy, in between is soil layer Pullback Pipe Diameter&Project Length:Φ1219mm×743m

Start & Finish Times of Project:2021.8.20-10.31

12

Project Name:Shandong Pipe Network South Trunk Line Chu Xiasi River Project Construction Equipment:GD6000-LL

Geological Conditions:Powdered mudstone

Pullback Pipe Diameter&Project Length:Φ1219mm×750m Start & Finish Times of Project:2021.6.13-10.4

13

Project Name:Jiangsu Binhai LNG Gas Transmission Pipeline Transmission Project Construction Equipment:GS5000-L

Geological Conditions:Powdered clay, powdered sand Pullback Pipe Diameter&Project Length:Φ914mm×802m Start & Finish Times of Project:2021.9.3-10.4

14

Project Name:Jiangsu Coastal Transmission Pipeline Rudong-Changshu Project Construction Equipment:GS5000-L

Geological Conditions:Sandy

Pullback Pipe Diameter&Project Length:Φ1016mm×608m Start & Finish Times of Project:2021.9.20-10.14

15

Project Name:Beijing LNG Gas Pipeline Tiangjing Emergency Reserve Jingguan River Project

Construction Equipment:GS6000-L

Geological Conditions:Powdered clay

Pullback Pipe Diameter&Project Length:Φ1219mm×508m Start & Finish Times of Project:2021.10.3-10.19

never stopping

"The large HDD Rigs of Goodeng Machinery have been the benchmark products in the industry, and it has been thirteen years since the first 600T large HDD Rig was put into use in 2008. Goodeng's large HDD Rigs have been used in key national projects such as South-North Water Transfer, West-East Gas Transmission, China-Myanmar Natural Gas Pipeline and China-Russia Gas Pipeline. "Goodeng Machinery" has stood the test of time and never failed to meet the expectations of customers, and has also won the recognition of the market."Goodeng Machinery" will devote itself to the research of humanized and intelligent technology of HDD Rigs, provide higher performance products for non-excavation users, and make more contributions to the pipeline crossing industry!

Previous: "An Unbeatable Rival of Rock"-GS500AT-LNext : Large-series hdd machine projects in the first quarter of 2022