Project Update|Goodeng GPY1068 Static Pile Driver on‑site at BTP Data Centre, Bangting, Selangor, Malaysia
2026-08-31
Our heavy‑duty GPY1068 full‑hydraulic static pile driver has arrived at the BTP Data Centre project site in Bangting, Selangor, Malaysia, delivering solid foundation support for this large‑scale data centre construction.
🔧Project Specification
• Pile type: Φ600 mm spun concrete circular pile
• Pile installation depth: 54 m
• Machine: Goodeng GPY1068 static pile driver
With maximum pressing force of 1068 tons, GPY1068 is well‑suited for large‑diameter & ultra‑deep precast pile works. The silent static pressing technology brings low‑vibration, low‑noise construction, reliable pile verticality and controlled final bearing capacity, perfectly matching high‑load requirements for data centre projects.
The machine is fully adapted to local 415V‑50Hz power supply condition. Modular design enables fast site assembly and copes with complicated local soil conditions for stable & efficient piling performance.
Goodeng Machinery keeps expanding footprint in Malaysia market, providing reliable static piling equipment & local‑oriented technical support for infrastructure, data centre and commercial building projects across Southeast Asia.
#Goodeng #GPY1068 #StaticPileDriver #PilingMalaysia #DataCentreFoundation

- Third-generation operating system, quick and effortless
- Medium-to-high pressure hydraulic system, construction is fast
- Q355 steel, strong and durable
- Scientific pipeline and wiring layout, reducing damage and making maintenance easier
- The ol circuit system is equipped with a safety valve to ensure that the system ol pressure will not exceed the set value and cause the machine to overload.
- The unique final pressure stablization system ensures that the machine will not float when the final presure is reached, which greatly improves the safe gperation perfomance of the pling.
- The lifting cylinder arranged in the fornward direction is supported by a solid piston rod, which is stronger in force. The structure is simple, and the falure rate is greatty reduced.
- Unigue cdlamping pressure keeping system can automaticaly refil ol if the oil cyinder leaks, ensuring high reliability of damping pile and construction qualiy.