Precautions for horizontal directional drilling rig construction in summer
Expertise

Precautions for horizontal directional drilling rig construction in summer

2025-07-24

  In summer, trenchless directional drilling construction needs to focus on preventing and controlling the impact of high temperatures and heavy rains. The core measures include:

   maintenance and management 
  1. Cooling system inspection

- Clean the radiator of the engine and hydraulic system regularly to avoid overheating caused by blockage by dust or mud.

- Check the coolant level and quality, and replace or refill it in time to ensure heat dissipation efficiency. 

goodeng directional oil pipeline rig

2. Hydraulic oil and lubrication management
- Use high temperature resistant hydraulic oil in summer, monitor oil temperature in real time (≤80℃) to prevent viscosity drop. - Use high temperature lubricating grease, focus on maintaining key parts such as drill pipe and power head to avoid high temperature loss or oxidation failure.
3. Electrical system protection
- Regularly check insulation to prevent high temperature short circuit, cut off power before thunderstorms and ensure grounding.
- Avoid long-term exposure of equipment to the sun, use awnings or cover the equipment when shut down.

II. Construction environment response
- There is a lot of rain in summer, and changes in soil moisture may affect the guidance accuracy, so the mud ratio needs to be adjusted in real time (such as increasing the proportion of clay to prevent cave-in).
- Suspend operations in thunderstorms and move low-lying equipment to prevent lightning strikes/flooding.)

goodeng hdd

III. Mud management
- High temperature accelerates the evaporation of mud water, so it is necessary to replenish and add anti-evaporation agent in time to maintain its lubrication and slag carrying performance.
- Set up a sunshade shed to store bentonite and other materials to prevent moisture and exposure.


IV. Construction plan adjustment

1. Work in different time periods

- Adopt the "early start, late end" mode, use the low temperature period in the early morning and evening to reduce the impact of high temperature on efficiency.

2. Shorten the duration of a single operation

- Stop every 2 hours to check the temperature and status of the equipment to avoid long-term high-load operation.

goodeng hdd rig for oil pipelines

1. Develop emergency plans

- For scenarios such as heavy rain, equipment overheating, and heat stroke, clarify the handling process (such as emergency shutdown and personnel transfer).

- Equip water pumps and sandbags to deal with accumulated water and ensure that drainage channels are unobstructed.

2. Equipment backup plan

- Reserve vulnerable parts (such as seals and filter elements) to avoid high temperature accelerated loss and shutdown.


V. Material and tool management

 - Anti-rust of drill pipe: The humidity is high in the rainy season, so the drill pipe should be cleaned and smeared with anti-rust oil in time after use.

- Locator protection: Avoid high temperature exposure to cause sensor errors, and increase the calibration frequency to once a day.


VI. Personnel safety and first aid

 1. Heatstroke prevention and cooling measures

Provide cool drinks, Huoxiang Zhengqi water and other heatstroke prevention materials, set up fan or air-conditioned rest areas, and avoid working during the high temperature period at noon.

2. Optimization of protective equipment

Wear breathable work clothes and safety helmets to avoid heatstroke; wear non-slip shoes and insulating equipment for rainy days.

3. Identification of danger signs of high-temperature work

Mild heatstroke: headache, nausea, flushed face

Severe heatstroke: convulsions, coma, "three no" symptoms (unable to speak/unable to walk/unable to recognize people)

4. First aid plan

Transfer: Immediately transfer to an air-conditioned room or a cool and ventilated place

Heat dissipation: Unbutton the collar to facilitate breathing and heat dissipation

Cooling: Wipe the armpits, neck, and groin with warm water

Rehydration: After confirming that there is no convulsion, give electrolyzed water and light salt water in small amounts and multiple times

Summer construction needs to focus on "preventing high temperatures, rain and waterlogging, and fatigue". Through meticulous equipment maintenance, dynamic environmental monitoring, and scientific personnel scheduling, the seasonal impact can be minimized to ensure project safety and progress.

Steven
Sales Manager
Jiangsu Goodeng Heavy Machinery Technology Co.,Ltd
Tel: +8618352028029  Whatsapp:8618352028029
Gmail: yudixiao32@gmail.com
Email:  caopengchen@goodeng.com.cn
Website:  www.goodeng.com.cn