300T Horizontal Directional Drilling Rig On-Site Construction
2026-04-29
Goodeng machinery 300ton hdd machine working in Kazakhstan.
Equipped with dual power system to meet the needs of different working conditions, it can flexibly realize dual-machine work or single-machine work, saving energy and reducing energy consumption; when one hydraulic system or engine fails, the other system can work normally (the power remains unchanged, The speed is slowed down), which greatly improves the safety of construction.


Pipe diameter: 1000 mm (steel pipe)
Drilling depth: 1200 mm
Geology: Saline-alkali soil, pebbles, sand
Construction distance: 700 meters
River crossing project