Leave Your Message
* Enter product details such as size, color,materials etc. and other specific requirements to receive an accurate quote. Cannot be empty
GS10000-L Shandong Pipeline & National Pipeline Beima South River Oriented Crossing Project
News

GS10000-L Shandong Pipeline & National Pipeline Beima South River Oriented Crossing Project

2026-02-28

Two extra-large horizontal directional drilling rigs, the GS10000-L and GS6000-T, from Guden Machinery were simultaneously deployed in Yantai to assist in the construction of the Shandong Pipeline East Trunk Line natural gas pipeline and the national natural gas pipeline network.

They simultaneously directionally drilled through all rock, using 1219mm diameter steel pipes, with total construction lengths of 700m and 725m respectively.Project Name 1: Shandong Pipeline East Trunk Natural Gas Pipeline Project - North-South River Directional Crossing

Construction Unit: Sinopec Shengli Oil Construction Engineering Co., Ltd.

Construction Equipment: GS10000-L

Length/Diameter: Φ1219mm×700m

Project Address: Longkou City, Yantai City, Shandong Province

Geological Conditions: Granite

The GS200-LS is Goodeng Machinery's flagship model sold in India, and it has won unanimous praise from the market for its fast construction speed and stable output torque!

新闻1

Project Name 2: National Oil and Gas Pipeline Network Project - North-South River Oriented Crossing

Construction Unit: Sinopec Shengli Oil Construction Engineering Co., Ltd.

Construction Equipment: GS6000-T

Length/Diameter: Φ1219mm×725m

Project Address: Longkou City, Yantai City, Shandong Province

Geological Conditions: Granite
新闻2

📞📞📞Contact: Kevin +8618352029024
                WhatsApp:+8618352029024