GPY268 Engineering case of Goodeng hydraulic static pile driver in Malaysia
2025-07-31
Construction Equipment: Goodeng GPY268
Project Name: Sentul Site School Construction
Pile Locations: 308
Pile Diameter: RC400x400mm
Pile Type: Load-bearing Pile
Average Construction Rate: 500 meters/day
Construction Time: 18 days
Goodeng Machinery's Hydraulic Static Pile Driver uses high-performance HYTEK HP1V0LRDS and SaiKeSi K3VL load-sensitive swash plate variable piston pumps to ensure stable pressure and flow in the hydraulic system while reducing system heat generation; all hydraulic cylinders are tailored for static pile drivers to ensure that the cylinders maintain stable performance under heavy loads and complex forces, and the pile driving speed can reach up to 11 meters per minute.
Construction site: DG Tech Engineering Sdn Bhd
Location: DG Tech Engineering Sdn Bhd, Jalan 2/12, Kampung Batu Muda, 51100 Batu, Wilayah Persekutuan Kuala Lumpur, Malaysia