Goodeng GS1000-L HDD Drilling Machine Project Site --Eelectric Cable Installation in China
Project Information

Project Features
u This project crosses an urban area with complex underground pipelines. The project must ensure the safety of existing underground pipelines while also allowing for clearance for other planned pipelines.
u Due to the high volume of pedestrian and vehicle traffic surrounding the project, the site cannot accommodate a single-step welding process, requiring segmented welding.
u This project will install five 220mm power pipes within an 1145mm inner diameter casing, with a maximum single-stage construction distance of 300 meters.
-
l Equipped with 264kW Cummins turbocharged engine.
l Equipped with German Linde pump and Rexroth motor
l The operator's cab with air-conditioning is rotatable, and the seat utilizes ergonomic design.
l The rotary manipulator can improve the efficiency and ensure safety for loading and unloading rod.
l Utilizes 3 tons crane.