Inquiry
Form loading...
Goodeng GS430-LS Trenchless HDD Drill/Bore Crawler Machine

Horizontal Directional Drill

Goodeng GS430-LS Trenchless HDD Drill/Bore Crawler Machine

Introducing the versatile and efficient steel crawler from Shanghai Goodeng International Co., Ltd. This mobility system features external rubber plates and wire-controlled walking, with two adjustable speeds for optimal performance. The loading system is equipped with a rotary manipulator and an optional automatic rod-loading box, providing added convenience and efficiency. The drilling system offers adjustable thrust-pullback speed in three settings, while the operating system boasts a panoramic rotating cab with heating and cooling air conditioning for operator comfort. Additionally, an optional crane is available for expanded functionality. With extra boost in the power head, this steel crawler is a reliable and powerful solution for a wide range of drilling and construction applications

    Technical Parameter

      Metric Unit Imperial Unit
    Weight 13000 kg 28660 lbs
    Dimension (L×W×H) 7300×2250×2270 mm 287.4×88.6×89.4 in
    Max.Thrust&Pullback Force 430/860 KN 96742/193484 lbf
    Max.Thrust&Pullback Speed 53 m/min 174 ft/min
    Max.Torque 19000 N·m 14013 ft·lb
    Max.Rotation Speed 185 r/min 185 rpm
    Engine Power 179 kW 240 hp
    Max.Flow of Mud Pump 450 L/min 119 gal/min
    Walking Speed 3-5km/h 1.86-3.11 mph
    Max.Mud Pump Pressure 8 MPa 1160 psi
    Entry Angle 25° 25°
    Max.Climbing Gradient 18° 18°
    Drill Rod Size φ73-φ83×3000 mm φ2.87-φ3.27 × 118.11 in
    Drill Pipe Box Capacity 27 pcs(3×9) 27 pcs(3×9)
    Recommended Reaming Diameter ≤φ1350 mm ≤ φ53.1 in
    Suggest Crossing Length ≤650 m ≤ 2133 ft

    Product Introduction

      1. The rotary adopts closed system, pushing and pulling, clamping, walking with automatic variable system, load-sensitive control; its hydraulic system

      Compared with the traditional hydraulic system: work efficiency increased by more than 20%, the system reduces heat generation by about 50%, energy saving equipment by 20%.

      Compared with the traditional hydraulic system, its hydraulic system can increase working efficiency by more than 20%, reduce system heat generation by about 50%, and save energy by 20%;

      2. Cummins special engine for construction machinery is adopted, which is energy-saving, environmentally friendly, highly efficient and powerful;

      3. The main beam adopts the structure of four-link amplitude-adjusting beam, which greatly improves the range of guided incidence angle; at the same time, it ensures that the tracks do not leave the ground during the construction of large angle, which improves the drilling efficiency.

      At the same time, it ensures that the crawler track does not leave the ground when working at a large angle, which improves the stability and safety of the drilling rig. 4;

      4. in-line control traveling system ensures the safety of the drilling rig in the process of traveling, transferring and loading;

      5. φ73-φ83 3000mm long drill pipe is applicable, and the body occupies a moderate area, which meets the demand for efficient construction in narrow sites;

      6. The main hydraulic components are selected from international first-class manufacturers, which greatly improves the reliability and safety of the product performance;

      7. The circuit design is scientific and reasonable, with low failure rate and easy maintenance;

      8. the track adopts steel track with rubber plates, which can withstand high loads and meet the needs of walking on different roads;

      9. The push and pull adopts rack and pinion structure: high efficiency, long service life, smooth operation and easy maintenance.

      10. Equipped with rotary manipulat

    43t-hosii8

    Main Configuration

    wechat-sh1

    Steel crawler with external rubber plates, wire-controlled walking, 2 speed adjustable.

    wechat-59s

    Panoramic rotating cab, with heating and cooling air conditioning

    wechat-r3k

    Equipped with rotary manipulat

    wechat-r8a

    The push and pull adopts rack and pinion structure: high efficiency, long service life, smooth operation and easy maintenance.

    wechat-vmv

    In-line control traveling system ensures the safety of the drilling rig in the process of traveling, transferring and loading

    wechat-jys

    In-line control traveling system ensures the safety of the drilling rig in the process of traveling, transferring and loading

    Contact Us

    Jiangsu Goodeng Heavy Machinery Technology Co., Ltd.

    icon1
    Address

    North of West Gongjian Road, Changzhou High-Tech Zone, Yancheng, Jiangsu, China

    icon3
    Phone

    +86 183 5202 8025
    (whatsapp:+8613601615181)

    icon4
    Hours

    Monday-Sunday: 24 HOURS