Leave Your Message
Goodeng Machine GS3000-LS Trenchless HDD Drill - Pipeline Utility Machine
GS-SeriesHorizontal Directional Drills

Goodeng Machine GS3000-LS Trenchless HDD Drill - Pipeline Utility Machine

Shanghai Goodeng International Co., Ltd. launches our latest product, featuring a Cummins construction-specialty engine, top-tier international hydraulic system, 5t truck crane, liftable AC-equipped panoramic cab/seat. It has a dual-power system (for rotating/pushing/pulling high-speed ops), PLC intelligent control (wireless/cable), 2-speed crawler travel, and a reserved 2.5-inch slurry inlet—ideal for high-performance, reliable construction use.

    Technical Parameter

      Metric Unit Imperial Unit
    Weight 52000 kg 114640 lbs
    Dimension (LxWxH) 18260 × 3200 × 3600mm 718 × 126 × 142 in
    Max.Thrust&Pullback Force 3000 KN 674442 lbf
    Max.Thrust&Pullback Speed 35 m/min 114.83  ft/min
    Max.Torque 100000 N·m 73756 ft·lb
    Max.Rotation Speed 95 r/min 95 rpm
    Engine Power 2 × 264 kW 2 × 354 hp
    Max. Climbing Gradient 18° 18°
    Walking Speed 3–5km/h 1.86–3.11mph
    Crane Capacity 5 Metric Tons 5.51 Short Tons
    Entry Angle  9° - 22° 9° - 22°
    Suggest Crossing Length ≤2000 m ≤ 6561 ft
    Drill Rod Size Φ140/Φ168×9600 mm Φ5.51"/Φ6.61" × 377.95 in
    Suggest Reaming Diameter ≤ Φ1800mm ≤ Φ70.87 in

    Main Characteristics

    • 1. The hydraulic system is comprised of the following components: The push-pull, rotation, and traveling functions are all operated via a closed system with electro-hydraulic proportional control.

      2. The double power system offers flexibility for different working conditions (supports double or single engine operation). If the hydraulic system or one engine fails, the other system can keep running to ensure construction safety.

      3. The front and rear clamps can be separated, and the gripper floats throughout, providing enhanced flexibility.

      4. The floating spindle is beneficial for protecting drilling rod screws.

      5. The floating beam is conducive to climbing and transportation, and the angle of incidence can be easily adjusted.

      6. The proportional line control walking system ensures the safety of the walking, loading, and unloading processes for both the machine and the operator.

      7. The electronic control handle is simple, reliable, and highly sensitive.

      8. The vehicle cab space is wide and the adjustable seat provides more comfort for the operator.

      9. The hydraulic system uses large-flow, high-pressure design and Goodeng Machinery’s cartridge control valve manifold to boost equipment performance, cutting pressure loss by about 50%.

      10. Goodeng Machinery’s electro-hydraulic joint control system enables the host machine’s adaptive control to different working/geological conditions (boosting efficiency by ~30%), with automatic and manual operation modes.

    gs3000 hdd machine

    solution MAIN DETAILS

    6 GS3000-LS

    5 GS3000-LS

    4 GS3000-LS

    3 GS3000-LS

    2 GS3000-LS

    1 GS3000-LS

    image

    application


    APPLICATION AREA

    Production Process

    1
    BLANKING 1

    BLANKING

    2
    RIVET-WELDING 2

    RIVET-WELDING

    3
    MACHINING 3

    MACHINING

    4
    ASSEMBLING 4

    ASSEMBLING

    5
    DEBUGGING 5

    DEBUGGING

    6
    TESTING 6

    TESTING

    65420be751dad22160
    Jiangsu Goodeng Heavy Machinery
    FAQ (2)

    FAQ

    • 1

      What about the warranty time?

      1.12 months after shipment or 2000 working hours,whichever occurs first.

    • 2

      What about the delivery time?

      10-20 days after receiving the deposit. 

    • 3

      What kind terms of payment can be accepted?

      On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client. On L/C term, 100% irrevocable L/C without "soft clause" can be accepted.

    • 4

      What logistics ways we can work for shipment?

      We can ship machine by sea and road.

    • 5

      What about the after-sales service?

      We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.

    • 6

      Can I visit your factory before ordering?

      Sure, welcome! Contact us for address and schedule details.

    Contact Us

    Jiangsu Goodeng Heavy Machinery Technology Co., Ltd.

    icon1
    Address

    North of West Gongjian Road, Changzhou High-Tech Zone, Yancheng, Jiangsu, China

    icon3
    Phone

    +86 183 5202 8098
    (whatsapp:+8618352028098)

    icon4
    Hours

    Monday-Sunday: 24 HOURS