Goodeng Hydraulic Static Pile Driver/GPY208/small /static the post mini pile/piling driver rig/machine
Technical Parameter
| Max.pile pressing force | 208(tf) | 208(tf) | |
| Piling speed (m/min) | High | 10.0 (m/min) |
20.5(ft/min) |
| Low | 2.0 (m/min) | 6(ft/min) | |
| Piling stroke | 1.6 (m) | 5.25(ft) | |
| Pace( m ) | Longitudinal | 2.2( m ) | 7.22(ft) |
| Horizontal | 0.5( m ) | 1.64(ft) | |
| Angle range | 13(°) | 13(°) | |
| Rise stroke | 1.58(m) | 5.18(ft) | |
| Pile clamping box | 4018 | 4018 | |
| Square pile | Min. | □150 (mm) | □5.9(in) |
| Max. | □300 (mm) | □11.81(in) | |
| Round Pile | Min. | φ300 (mm) | φ11.81(in) |
| Max. | φ400 (mm) | φ15.75(in) | |
| Side piling space | 1.03(m) | 40.05(in) | |
| Corner piling space | 1.7(m) | 66.58(in) | |
| Lifting weight | 12(T) | 26455(lb) | |
| Hoisting pile length | 14(m) | 551(in) | |
| Loading pressure | Long bridge | 115.8(Kpa) | 1.158(bar) |
| Short bridge | 120.6(Kpa) | 1.206(bar) | |
| Dimension | Working length | 11.7 (m) | 460.5(in) |
| Working width | 5.38 (m) | 211.4(in) | |
| Transportation height | 2.89 (m) | 113.7(in) | |
- Unique clamping pressure-keeping system can automatically fill in the fuel if the cylinder leak oil, ensuring high reliability of clamping pile and high quality of construction.
- Unique terminal pressure-stabilized system ensures no float to the machine at rated pressure, greatly improving the safety of operation.
- The lifting cylinders are installed in the straight way. We adopt solid piston for supporting with greater stress intensity and the structure is simpler for easy maintenance.

BLANKING

RIVET-WELDING

MACHINING

ASSEMBLING

DEBUGGING

TESTING

-
1
What is the maximum pile pressing force of GPY208? Which markets is it primarily targeting?
Maximum force: 208 tons. Key model for Southeast Asian & overseas markets, designed for growing regional demand. Used in Malaysia; suitable for row houses and factory infrastructure. Recognized for strong performance and fast piling speed.
-
2
What unique energy-saving technologies does GPY208 feature? How is its energy consumption performance?
Equipped with constant power hydraulic system, full constant power control, large-displacement pumps & high-power motors for fast speed with low energy. Pump-controlled pressure minimizes loss; integrated valve block allows cab adjustments. Scientific pipeline layout reduces losses.
-
3
What is the function of GPY208‘s adaptive clamping force technology?
Patented adaptive technology automatically adjusts clamping force based on conditions, saving energy while ensuring reliable clamping. Unique clamping pressure-keeping system auto-refills oil if cylinder leaks, reducing interruption risk and ensuring pile quality.
-
4
What innovative designs does GPY208 have for improving construction efficiency?
Precise matching of pile cylinder & pump unit for max efficiency. Patented auxiliary pressure lifting follow-up technology shortens auxiliary time. Quick return design reduces clamping box lift time. Hydraulic walking system with auto reset & rotation compensation enables small ground contact pressure, adapting to complex sites.
-
5
What user-friendly designs does GPY208 offer in terms of cab and operating environment?
Standard AC in cab for comfort in hot climates. Integrated pressure valve block allows all adjustments without leaving cab. Enhances experience, reduces weather exposure, improves safety.
-
6
What advantages does GPY208 offer in side pile and corner pile construction?
Side/corner piling force reaches 60‑70% of main force, far outperforming traditional systems. Integrated side pile structure + suspended side pile device mountable in three directions, flexible use with small spaces, effective for dense pile conditions.
Jiangsu Goodeng Heavy Machinery Technology Co., Ltd.







