Leave Your Message
Goodeng Hydraulic Static Pile Driver/GPY268/pile driving/driver boat contractors machine
Hydraulic Static Pile Driver

Goodeng Hydraulic Static Pile Driver/GPY268/pile driving/driver boat contractors machine

1. High-efficiency and energy-saving constant power hydraulic system.

2.The pile cylinder and motor pump unit are accurately matched and combined.

3. The pile cylinder returns quickly, reducing the time for lifting the pile clamping box, making the construction faster and improving the efficiency of pile pressing.

4.Scientific hydraulic pipeline layout can greatly reduce pipeline losses, hydraulic system losses, and save energy.

5.A static pile driver can be used directly to conduct static load tests on piles.

6.The whole machine is easy to disassemble and assemble, and its modular design makes it easy to transport.

7.The hydraulic cylinder walking has automatic reset and rotation compensation functions. The whole machine has a small grounding specific pressure and is suitable for more sites.

8.Add counterweights (optional) on both sides to lower the center of gravity of the entire machine and make construction safer.

    Technical Parameter

    Metric Unit Imperial Unit
    Max.pile pressing force  268(tf) 268(tf)
    Piling speed  High 7.5(m/min) 15.37(ft/min)
    Low 1.2(m/min) 3.6(ft/min)
    Piling stroke  1.6(m) 52.5(ft)
    Pace Longitudinal 3.0( m ) 9.84(ft)
    Horizontal 0.6(m) 2(ft)
    Angle range 11 (°) 11 (°)
    Rise stroke  0.9(m) 2.95(ft)
    Pile clamping box 5022 5022
    Square pile Min. □ 300(mm) □11.8(in)
    Max. □500(mm) □19.7(in)
    Round Pile  Min. φ300(mm) φ11.8(in)
    Max. φ500(mm) φ19.7(in)
    Side piling space 0.9(m) 35(in)
    Corner piling space  1.2(m) 47(in)
    Lifting weight  12(T) 26455(lb)
    Hoisting pile length  14(m) 551(in)
    Loading pressure  Long bridge 106(Kpa) 1.06(bar)
    Short bridge 135(kpa) 1.35(bar)
    Dimension   Working length 11(m) 433(in)
    Working width 6.31(m) 248(in)
    Transportation height 3.05(m) 120(in)

    Product Introduction

    GPY208 has an integrated side pile structure and adopts a suspended side pile device. When the user needs to drive side piles, the side pile devices can be mounted in three directions on the fuselage. It is flexible to use and the distance between the side piles and corner piles is small.

    •  It is mainly composed of two long bridges, two longitudinal shift cylinders and four traveling trolleys. The relative position change between the fuselage and the long bridge is realized through the expansion and contraction of two longitudinal shift cylinders.
    •  The whole machine is externally connected to AC380V, 50HZ three-phase standard electricity, and the oil pump motor unit provides the power source. The oil pump motor adopts the star-delta step-down starting method to reduce the current impact on the entire power grid; this electrical system is equipped with shortcircuit protection, overload protection, and phase failure. Protection measures such as leakage protection and grounding protection.

    530dcf9wfa

    solution MAIN DETAILS

    GPY268-2

    Goodeng Hydraulic Static Pile Driver/GPY268/pile driving/driver boat contractors machine

    Goodeng Hydraulic Static Pile Driver/GPY268/pile driving/driver boat contractors machine

    Goodeng Hydraulic Static Pile Driver/GPY268/pile driving/driver boat contractors machine

    Goodeng Hydraulic Static Pile Driver/GPY268/pile driving/driver boat contractors machine

    Goodeng Hydraulic Static Pile Driver/GPY268/pile driving/driver boat contractors machine

    image

    application


    APPLICATION AREA

    Production Process

    1
    BLANKING 1

    BLANKING

    2
    RIVET-WELDING 2

    RIVET-WELDING

    3
    MACHINING 3

    MACHINING

    4
    ASSEMBLING 4

    ASSEMBLING

    5
    DEBUGGING 5

    DEBUGGING

    6
    TESTING 6

    TESTING

    65420be751dad22160
    Jiangsu Goodeng Heavy Machinery
    FAQ (2)

    FAQ

    • 1

      What is the maximum pile pressing force of GPY268? Which complex geological conditions is it suitable for?

      Maximum force: 268 tons. Speed: ~7.5 m/min, stroke: 1.6 m. Suitable for soft soil, clay, sandy soil. Proven in overseas projects with stable pile quality.

    • 2

      What outstanding advantages does GPY268 have in energy efficiency and environmental protection?

      Constant power hydraulic system: no noise, vibration, or pollution. Matched pump/motor unit + quick oil return design reduces clamping box lift time, faster construction. Ideal for dense urban/narrow sites, supporting green construction.

    • 3

      What are the advantages of GPY268‘s star-delta step-down starting electrical control system? How safe is it?

      Star-delta starting reduces grid current impact. Electrical safety: short circuit, overload, phase failure, leakage, and grounding protection. Enhances reliability in complex sites, reduces power-related failure risk.

    • 4

      How does GPY268’s overseas warehousing and rapid delivery service operate?

      Key overseas model with Malaysia branch & local warehousing for rapid delivery/emergency supply. In April 2026, a unit rushed overnight to Ipoh, Malaysia. Professional overseas network enables quick response, helping customers meet project deadlines.

    • 5

      What types and sizes of piles is GPY268 compatible with?

      Square: 300‑500 mm; round: φ300‑φ500 mm. Integrated side pile structure, devices mountable in three directions. Side space: 0.9 m, corner space: 1.2 m – efficient in confined spaces. Customization available.

    • 6

      What quality assurance measures does GPY268 have for its hydraulic system and key components?

      High-reliability hydraulic system, forged key components for long life. Unique pipeline design ensures cleanliness & reliability. Travel mechanism: hydraulic cylinders with auto reset & rotation compensation, small ground contact pressure for complex sites.

    • 7

      What user-friendly designs does GPY268 have in terms of operational convenience and comfort?

      Fully hydraulic crawler travel (auto longitudinal/transverse movement & pivot steering). PLC control simplifies operation, reduces operator workload. (Cab comfort similar to GPY208 with standard AC).

    Contact Us

    Jiangsu Goodeng Heavy Machinery Technology Co., Ltd.

    icon1
    Address
    North of west gongjian road,Changzhou High-tech Zone, Yancheng, Jiangsu,China
    icon2
    E-mail
    ganchaoren@goodeng.
    com.cn
    icon3
    Phone
    +86 18352028024
    icon4
    Hours
    24 Hours