Goodeng Hydraulic Static Pile Driver/GPY268/pile driving/driver boat contractors machine
Technical Parameter
| Metric Unit | Imperial Unit | ||
| Max.pile pressing force | 268(tf) | 268(tf) | |
| Piling speed | High | 7.5(m/min) | 15.37(ft/min) |
| Low | 1.2(m/min) | 3.6(ft/min) | |
| Piling stroke | 1.6(m) | 52.5(ft) | |
| Pace | Longitudinal | 3.0( m ) | 9.84(ft) |
| Horizontal | 0.6(m) | 2(ft) | |
| Angle range | 11 (°) | 11 (°) | |
| Rise stroke | 0.9(m) | 2.95(ft) | |
| Pile clamping box | 5022 | 5022 | |
| Square pile | Min. | □ 300(mm) | □11.8(in) |
| Max. | □500(mm) | □19.7(in) | |
| Round Pile | Min. | φ300(mm) | φ11.8(in) |
| Max. | φ500(mm) | φ19.7(in) | |
| Side piling space | 0.9(m) | 35(in) | |
| Corner piling space | 1.2(m) | 47(in) | |
| Lifting weight | 12(T) | 26455(lb) | |
| Hoisting pile length | 14(m) | 551(in) | |
| Loading pressure | Long bridge | 106(Kpa) | 1.06(bar) |
| Short bridge | 135(kpa) | 1.35(bar) | |
| Dimension | Working length | 11(m) | 433(in) |
| Working width | 6.31(m) | 248(in) | |
| Transportation height | 3.05(m) | 120(in) | |
- It is mainly composed of two long bridges, two longitudinal shift cylinders and four traveling trolleys. The relative position change between the fuselage and the long bridge is realized through the expansion and contraction of two longitudinal shift cylinders.
- The whole machine is externally connected to AC380V, 50HZ three-phase standard electricity, and the oil pump motor unit provides the power source. The oil pump motor adopts the star-delta step-down starting method to reduce the current impact on the entire power grid; this electrical system is equipped with shortcircuit protection, overload protection, and phase failure. Protection measures such as leakage protection and grounding protection.

Main Configuration






Jiangsu Goodeng Heavy Machinery Technology Co., Ltd.
Address
North of west gongjian road,Changzhou High-tech Zone, Yancheng, Jiangsu,China
E-mail
ganchaoren@goodeng.
com.cn
Phone
+86 18352028024
Hours
24 Hours