Goodeng Machine Hydraulic Static Pile Driver/GPY188/pile driving/driver boat contractors machine
Technical Parameter
1) High-efficiency and energy-saving constant power hydraulic system.
2) The pile cylinder and motor pump unit are accurately matched and combined.
3) The pile cylinder returns quickly, reducing the time for lifting the pile clamping box, making the construction faster and improving the efficiency of pile pressing.
4) Scientific hydraulic pipeline layout can greatly reduce pipeline losses, hydraulic system losses, and save energy.
5) A static pile driver can be used directly to conduct static load tests on piles.
6) The whole machine is easy to disassemble and assemble, and its modular design makes it easy to transport.
7) The hydraulic cylinder walking has automatic reset and rotation compensation functions. The whole machine has a small grounding specific pressure and is suitable for more sites.
8) Add counterweights (optional) on both sides to lower the center of gravity of the entire machine and make construction safer.
- It is mainly composed of two long bridges, two longitudinal shift cylinders and four traveling trolleys. The relative position change between the fuselage and the long bridge is realized through the expansion and contraction of two longitudinal shift cylinders.
- The whole machine is externally connected to AC380V, 50HZ three-phase standard electricity, and the oil pump motor unit provides the power source. The oil pump motor adopts the star-delta step-down starting method to reduce the current impact on the entire power grid; this electrical system is equipped with shortcircuit protection, overload protection, and phase failure. Protection measures such as leakage protection and grounding protection.


BLANKING

RIVET-WELDING

MACHINING

ASSEMBLING

DEBUGGING

TESTING

-
1
What is the maximum pile pressing force of GPY188? What construction scenarios can it meet?
Maximum force: 188 tons. Compact size (8.6×3.4×3.6 m) fits through standard plant doors for indoor construction without disassembly. Ideal for plant renovation, expressway widening, port yard upgrades, and other space-constrained existing projects.
-
2
How fast is the piling speed of GPY188? What is its construction efficiency?
Speed: 7.5‑10.55 m/min, stroke 1.2 m. Fully hydraulic crawler travel enables automatic longitudinal/transverse movement and pivot steering, allowing agile positioning with low ground flatness requirements, quick relocation, and high overall efficiency.
-
3
How environmentally friendly is GPY188? Is it suitable for construction in sensitive areas?
Pure static piling: vibration‑free, low noise, no slurry pollution. Suitable for city centers, hospitals/schools, and in‑service expressways (“traffic keeping & simultaneous construction”). Real‑time pile pressing force data helps evaluate bearing capacity, synchronizing construction and testing.
-
4
What are the advantages of GPY188’s final pressure stabilization system? How safe is it?
Unique system prevents machine floating at final pressure. Electrical: low voltage + short circuit/thermal overload protection. Hydraulic: safety valve prevents overpressure. Fully hydraulic + PLC control enhance reliability and operational safety.
-
5
What types and sizes of piles is GPY188 compatible with?
Square piles: 200‑400 mm; cylindrical piles: Φ300‑Φ500 mm. Integrated side pile structure with minimum 300 mm side space offers excellent side piling. Goodeng provides customization for other sizes/configurations.
-
6
Is GPY188 easy to transport and assemble?
Dimensions fit standard flatbed trucks for complete transport without disassembly, enabling rapid relocation. Modular design simplifies disassembly/reassembly, reducing costs for contractors moving frequently between sites.
Jiangsu Goodeng Heavy Machinery Technology Co., Ltd.
whatsapp:+86 13601615181

